Shenzhen Kinmore Motor Co., Ltd.

Concise, standardized, and efficient business process

Motor Develop Process

How We Proceed With Business

Customers can share their project requirements with us via telephone, email, or online forms. Upon receiving the details, our engineering and sales teams conduct a preliminary evaluation based on the provided information and our experience with similar solutions. All inquiries are answered within 12 hours on working days.

After the initial assessment, we collaborate closely with the customer to clarify technical specifications, application scenarios, and performance requirements. We then provide a tailored solution, which may include selecting the most suitable motor type, designing a customized gearbox, or offering an integrated drive system. Throughout the process, our team ensures timely communication, technical guidance, and reliable delivery, helping clients optimize their projects, improve efficiency, and achieve long-term success.

Product Development Process

1. Requirements Analysis

In order to ensure that the new DC motor and gear motor can be delivered to customers with satisfaction, Kinmore sales engineers should be aware of customers’ projects and their requirements completely which include:
  • DC motor/ gear motor dimensions and connection inStallation dimensions.
  • Electrical performance data includes motor working Speed, working Current, and Torque, Stall Current, Stall Torque, work duty, working environment conditions, noise requirements, life expectancy, etc.
  • The markets regulation and laws (optional) such as UL, CE, RoHS, REACH, etc
  • Other requirements like the target of cost and delivery time.

2. Feasibility Analysis Report

Kinmore design team provide the Feasibility Analysis Report to customers that include:

  • Time of product development, product costs, and molds costs.
  • Design risk evaluation

3. Confirmed Motor Specification

Kinmore design engineers utilize advanced design technology like FMEA, VE, and the latest analysis system like MEA Motor Performance Analyzing System, Starting Torque Tester, Gearhead design software to design a product. The design processes include:

  • Gather all requirements from customers to set up the customer file.
  • Proceed Functional verification DC motor/gear motor by 2D/3D drawings
  • Make specifications and manuals.
  • Evaluate the necessary for apply patent

4. Design Verification

  • Design input/Output review
  • Pilot test: To test the full performance of the samples and validate all of the data meet the specification’s needs.

5. Set Up the Schedule

  • Set up the schedule and share the updated implementation with customers in real-time.
  • The development of necessary molds as well as the cost checking and annotation of them.
  • Pre-set the production process and confirm the list of equipment and facilities. Then complete the productivity evaluation.
  • Deliver the samples and run the motor test in the project. Then improve the samples until they are proved working perfectly for the project.
  • Organize the production lines based on human resources and the delivery time.

6. Delivery and More Services​

  • Manage the product lines to ensure the due time of batch delivery. Then arRange the shipping by the demands of customers.
  • After the delivery, we also provide full services for the customer to finish their project or for further cooperation.
Inquiry Form