Shenzhen Kinmore Motor Co., Ltd.

Related Products

20 mm
KM-20A180-5
KM-20A180
8 mm
FF-K10VA-03
FF-K10VA
36 mm
KM-36X3650-5
KM-36X3650
38 mm
KM-38F520-002
KM-38F520
27.7 mm
RS-390 395A-1
RS-390/395A
35.8 mm
RS-540 545H-001
RS-540/545H

FAQs

Can the gearbox be customized?

Yes, our R & D team can develop and customize the gearbox;

Gearbox customization projects include gear customization, dimensions, internal structure, performance parameters and related custom accessories to meet customer requirements.

What are the types of gears do you use in gearbox?

We now produce a complete range of gear types.

According to gear structure: straight teeth, helical gear, bevel gear, worm gear, worm gear;

Accroding to gear material: plastic teeth, metal teeth (copper, stainless steel, powder metallurgy).

Can I visit the motor factory of Kinmore?

You are very welcome to visit us at any time, but please give us a few days’ notice so that we can arrange the schedule and plan the visit.

What parameter information is needed for motor evaluation?

Customers need to clearly provide the performance and shape requirements of the product (different shapes determine the size of the space, which will be directly related to the performance that different specifications can achieve such as torque values are different). Performance requirements include operating voltage, rated load, rated speed and other parameters, and appearance requirements include the maximum installation size, shaft size, terminal direction and so on.

In addition, if the customer has other more detailed requirements such as current limits, working environment, service life and EMC standards can also be provided together, which will help us to carry out a more accurate and comprehensive assessment to ensure that the final product can meet the customer’s individual needs.

Could you tell me the lead time for samples and orders?

The delivery time of general DC motor samples is usually 10 to 15 days, and the delivery time of gear motor samples is 15 to 20 days.

If there are special customized requirements, such as lengthening the shaft, special reduction ratio, etc, the delivery time will be extended accordingly.

The standard order lead time is 35 days, but this time can be adjusted according to different models, production cycles and order quantities.

Inquiry Form

Send an Inquiry